1 to 6 of 6
Sort by: Date | Relevance
The Quality Manager is responsible for the development, implementation, maintenance, and improvement of the Quality System to assure that the products manufactured and services provided meet customer requirements. The Quality System must be aligned with the corporate Quality System and meet the ISO9001/IATF16949 standards or other applicable automotive quality standard as
Posted 1 day ago
Performs basic MRO inventory control functions, which includes overseeing existing MRO inventory; replacing used MRO inventory items; replenish MRO inventory throughout the plant; and maintaining a collective, ongoing record of MRO items, materials, tools, and equipment inside the Tool Crib. The incumbent must promote a predictive, not precative, maintenance philosophy by
Posted 6 days ago
Position Production Operator 2nd & 3rd Shift Location Goshen, IN Remote Status On Site Job Id 1642 # of Openings 12 $18.76/Hour plus an additional $1.50/Hour shift premium for 2nd & 3rd shift. Essential Duties and Responsibilities include the following. Other duties may be assigned. 1. Operates work station to assemble components as dictated by the manufacturing systems a
Posted 10 days ago
Develop and implement quality control procedures Conduct tests and inspections to ensure products meet quality standards Analyze data to identify areas for improvement Work closely with other departments to ensure quality standards are met throughout the production process Provide training and support to other team members on quality control procedures Ensure compliance w
Posted 14 days ago
Position Hot Stamp Technician Location Goshen, IN Remote Status On Site Job Id 1543 # of Openings 6 Hot Stamp Technician Ensure all equipment and the work areas are cleaned daily and are free of safety hazards. Operate all machinery according to established safety guidelines and wear required PPE at all times. Actively participate, practice, and improve upon the 5S philos
Posted 30 days ago
Responsible for budget (plan)/trend forecast and provide explanation of significant variances, including analysis of actual vs. budget (plan) or forecast. Focus on month end results/reporting but most importantly strategic planning to ensure the business is growing the business profitability. A strong link between the plant's business plan and forecast vs. actual results
Posted 1 month ago
Email this Job to Yourself or a Friend
Indicates required fields